![](https://www.loging.si/wp-content/uploads/dsv-bayer-skladiscne-police-768x482.jpg)
![](https://www.loging.si/wp-content/uploads/dsv-bayer-skladisce-768x480.jpg)
![](https://www.loging.si/wp-content/uploads/dsv-bayer-notranjost-768x480.jpg)
![](https://www.loging.si/wp-content/uploads/dsv-bayer-768x480.jpg)
![](https://www.loging.si/wp-content/uploads/dsv-bayer-zunaj-768x480.jpg)
![](https://www.loging.si/wp-content/uploads/dsv-bayer-vozna-pot-768x481.jpg)
At the end of the year 2013 we carried out a reconstruction of the high-racking storage facility in Naklo (12.000 m2), which we constructed in 2008 for the company DSV Transport, to meet the needs of the new tenant – a well-known pharmaceutical company. We reconstructed the high-racking facility of 3.100 m2, built a new middle floor of 670 m2 and installed the entire necessary infrastructure (office space on three floors, cold room, GMP clean room and loading ramps). Thus we reconstructed a big part of the former logistics centre into a pharmaceutical warehouse with all the necessary logistics support.